[1] Da Qinli, Liu Xinwang. A weighted aggregate method for the fuzzy decision making of multiobjective linear programming[J]. Journal of Systems Engineering, 1999, 14 (3): 247-250, 257. [达庆利, 刘新旺. 多目标线性规划模糊决策的加权集成方法[J]. 系统工程学报, 1999, 14 (3): 247-250, 257.] [2] Ouyang Zhiyun, Wang Xiaoke, Miao Hong. A primary study on Chinese terrestrial ecosystem services and their ecological-economic values[J]. Acta Ecologica Sinica, 1999, 19 (5):607-613. [欧阳志云, 王效科, 苗鸿. 中国陆地生态系统服务功能及其生态价值的初步研究[J]. 生态学报, 1999, 19 (5):607-613.] [3] Constanza Z, d'Arge, de Groot R, et al. The value of the world's ecosystem services and nature capital[J]. Nature. 1997, 387:253-260. [4] Lucien Duckstein. Multi-objective optimization in river basin development[J]. Water Resources Research. 1980, 16(1):14-20. [5] Meng Jijun. The key factors to the oases ecological balance: water resources - the case of Zhangye oasis [J]. Resources Science, 1998, 20 (6): 8-14. [蒙吉军. 水资源:绿洲生态平衡的关键——张掖绿洲案例研究 [J]. 资源科学, 1998, 20 (6): 8-14.] [6] Ren Wangbin. Multi-objective programming model for water-saving system of oasis agriculture[J]. Journal of ASrid Land Resources and Environment. 1997, 11 (2):49-57. [任望冰. 绿洲农业节水系统的多目标规划模型[J]. 干旱区资源与环境, 1997, 11 (2):49-57.] [7] Wang Genxu. Analysis of rational utilization of water resources in Eijina green district of Heihe river[J]. Journal of Lanzhou University (natural science). 1997, 33 (3): 111-116. [王根绪. 黑河流域额济纳绿洲地区水资源合理利用分析[J]. 兰州大学学报(自然科学版): 1997, 33 (3): 111-116.] [8] Gao Suixiang. A discussion to the more-for-less phenomenon in optimum programming[J]. Systems Engineering Theory, Methodology, applications, 1996, 5 (2): 61-67. [高随祥. 对优化问题中多反而少现象的探讨[J]. 系统工程理论方法应用, 1996, 5 (2): 61-67.] [9] Wang Wenping. A study on satisfaction degree method to multiobjective grey linear programming[J]. Journal of Industrial Engineering Management. 1997, 11 (3): 167-172. [王文平. 多目标灰线性规划的满意度解法研究[J]. 管理工程学报, 1997, 11 (3): 167-172.] [10] 张掖水利. http://www.gsll.gov.cn/news/b/news.asp. newsid=474. |